Skip to content
Turing Registry
Menu
Search
Browse
Domains
Operators
Revocations
Statistics
About
Frothly
Operator
Capital Region Power Cooperative
12 filings on the register, most recent first.
7
active
1
suspended
4
retired
Capital Region Power Cooperative: filings, most recent first
Filing
System
Domain
Latest filing
Status
TR-09319
LOADLINE SENSE
Electrical grid balancing
2026-09-13
Active
TR-01556
VOLTAGESCOPE
Electrical grid balancing
2026-07-07
Active
TR-10863
VOLTAGEMATE
Electrical grid balancing
2026-05-18
Active
TR-10832
PEBBLE BALANCE
Electrical grid balancing
2026-04-18
Active
TR-09565
VOLTAGE 3
Electrical grid balancing
2026-03-15
Active
TR-03414
KARST LOADLINE
Suspended pending an independent evaluation.
Electrical grid balancing
2026-01-13
Suspended
TR-06886
LEAKWATCH MATE
Pipeline leak detection
2025-07-08
Active
TR-05893
VOLTAGE KEEPER
Electrical grid balancing
2025-02-17
Active
TR-07649
SUBSTATION 2
Replaced by TR-09565.
Electrical grid balancing
2023-04-04
Retired
TR-04267
VOLTAGE 5
Replaced by TR-09319.
Electrical grid balancing
2022-09-16
Retired
TR-08121
SWIFT GASLINE
Pipeline leak detection
2021-04-01
Retired
TR-00171
BALANCE 2
Replaced by TR-05893.
Electrical grid balancing
2015-02-15
Retired