Turing Registry · TR-00134

LOADLINE 2

Electrical grid balancing. Operated by Thornbrook Falls Public Utilities.

Summary

Balances supply and demand across a distribution network serving about 171 thousand customers in Thornbrook Falls.

License conditions

  1. May not disconnect customers who depend on medical equipment.
  2. Control actions above 57 MW require operator confirmation.
  3. Hands control back to human operators within five seconds of any fault.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Retired and replaced by TR-03269.

Related filings

Also filed by Thornbrook Falls Public Utilities

All 13 filings by this operator →