Turing Registry · TR-00336

LOADLINE 8

Electrical grid balancing. Operated by Marcrest Springs Public Utilities.

Summary

Dispatches battery storage and demand response for Marcrest Springs Public Utilities, within limits set by the grid operator.

License conditions

  1. Control actions above 74 MW require operator confirmation.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved after an independent evaluation.

  4. Renewal filed and approved.

  5. Independent evaluation completed. License scope confirmed.

  6. Renewal filed and approved with no change to scope.

  7. Renewal filed and approved.

  8. Renewal filed and approved after an independent evaluation.

  9. Renewal filed and approved after an independent evaluation.

  10. Renewal filed and approved.

  11. Renewal filed and approved.

  12. Renewal filed and approved.

  13. Renewal filed and approved.

  14. Review opened after an unplanned outage affecting 15 thousand customers.

Also filed by Marcrest Springs Public Utilities

All 17 filings by this operator →