Turing Registry · TR-00420

SUBSTATION SENSE

Electrical grid balancing. Operated by Lowland Grid Operator.

Summary

Balances supply and demand across a distribution network serving about 611 thousand customers in North Southholm.

License conditions

  1. May not disconnect customers who depend on medical equipment.
  2. Control actions above 47 MW require operator confirmation.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Renewal filed and approved with no change to scope.

  5. Renewal filed and approved with no change to scope.

  6. Renewal filed and approved after an independent evaluation.

  7. Renewal filed and approved after an independent evaluation.

  8. Renewal filed and approved.

  9. Renewal filed and approved.

  10. Renewal filed and approved.

  11. Renewal filed and approved.

  12. Renewal filed and approved after an independent evaluation.

Also filed by Lowland Grid Operator

All 10 filings by this operator →