Turing Registry · TR-00811

SUBSTATION LINK

Electrical grid balancing. Operated by Redwick Falls Electric.

Summary

Balances supply and demand across a distribution network serving about 567 thousand customers in Redwick Falls.

License conditions

  1. Hands control back to human operators within five seconds of any fault.
  2. Control actions above 54 MW require operator confirmation.
  3. May not disconnect customers who depend on medical equipment.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved after an independent evaluation.

  4. Renewal filed and approved.

  5. Renewal filed and approved after an independent evaluation.

  6. Renewal filed and approved.

  7. Renewal filed and approved.

  8. Human contact changed. Ivo Ortega now answers for the system.

  9. Renewal filed and approved after an independent evaluation.

  10. Renewal filed and approved after an independent evaluation.

  11. Renewal filed and approved after an independent evaluation.

  12. Renewal filed and approved after an independent evaluation.

  13. Renewal filed and approved.

Also filed by Redwick Falls Electric

All 13 filings by this operator →