Turing Registry · TR-01009

SUBSTATION 8

Electrical grid balancing. Operated by Granite Coast Grid Operator.

Summary

Balances supply and demand across a distribution network serving about 699 thousand customers in Redridge Falls.

License conditions

  1. Control actions above 62 MW require operator confirmation.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved with no change to scope.

  3. Renewal filed and approved.

  4. Renewal filed and approved with no change to scope.

  5. Complaint received from a member of the public. Investigated and closed with no breach found.

  6. Renewal filed and approved.

  7. Renewal filed and approved after an independent evaluation.

  8. Renewal filed and approved.

  9. Renewal filed and approved.

  10. Renewal filed and approved.

  11. Renewal filed and approved with no change to scope.

  12. Sensor outage of 6 hours. The plant ran under manual control throughout.

  13. Renewal filed and approved.

  14. Renewal filed and approved.

Also filed by Granite Coast Grid Operator

All 17 filings by this operator →