Turing Registry · TR-01192

WELDCHECK CORE

Manufacturing quality inspection. Operated by Alderwater Glassworks.

Summary

Camera-based inspection on 16 production lines at Alderwater Glassworks, rejecting defective parts.

License conditions

  1. May not lower inspection thresholds to raise throughput.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for manufacturing quality inspection.

  2. Renewal filed and approved.

  3. Renewal filed and approved after an independent evaluation.

  4. Renewal filed and approved after an independent evaluation.

  5. Renewal filed and approved with no change to scope.

  6. Annual audit completed with no findings.

  7. Renewal filed and approved.

  8. Renewal filed and approved after an independent evaluation.

  9. Renewal filed and approved.

  10. Renewal filed and approved.

  11. Renewal filed and approved with no change to scope.

  12. Renewal filed and approved.

  13. Renewal filed and approved.

  14. Renewal filed and approved.

  15. Renewal filed and approved.

  16. Renewal filed and approved.

  17. Renewal filed and approved with no change to scope.

  18. Renewal filed and approved.

  19. Renewal filed and approved.

  20. Renewal filed and approved.

  21. Renewal filed and approved after an independent evaluation.

  22. Renewal filed and approved after an independent evaluation.

  23. Renewal filed and approved with no change to scope.

  24. Renewal filed and approved.

Also filed by Alderwater Glassworks

All 13 filings by this operator →