Summary
Schedules maintenance and curtails turbines during bird migration at Granite Coast Wind sites.
License conditions
- Turbines curtail automatically when protected birds are detected nearby.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for wind farm operations.
Renewal filed and approved.
Human contact changed. Noor Tamm now answers for the system.
Renewal filed and approved with no change to scope.
Retired after the operator stopped trading.