Turing Registry · TR-01420

EGRET SUBSTATION

Electrical grid balancing. Operated by Bellhallow Electric.

Summary

Dispatches battery storage and demand response for Bellhallow Electric, within limits set by the grid operator.

License conditions

  1. Hands control back to human operators within five seconds of any fault.
  2. Control actions above 13 MW require operator confirmation.
  3. May not disconnect customers who depend on medical equipment.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved after an independent evaluation.

  4. Renewal filed and approved.

  5. Renewal filed and approved.

  6. Renewal filed and approved after an independent evaluation.

  7. Data-retention audit completed. Two minor findings, both resolved.

  8. Renewal filed and approved.

  9. Renewal filed and approved.

  10. Renewal filed and approved with no change to scope.

  11. Renewal filed and approved.

  12. Renewal filed and approved.

  13. Annual audit completed with no findings.

  14. Renewal filed and approved after an independent evaluation.

Also filed by Bellhallow Electric

All 10 filings by this operator →