Summary
Dispatches battery storage and demand response for Southeast Grid Operator, within limits set by the grid operator.
License conditions
- May not disconnect customers who depend on medical equipment.
- Control actions above 63 MW require operator confirmation.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for electrical grid balancing.
Renewal filed and approved with no change to scope.
Annual audit completed with no findings.
Renewal filed and approved with no change to scope.
Renewal filed and approved with no change to scope.
Renewal filed and approved.
Retired by the operator.