Turing Registry · TR-02418

TURBINE 8

Wind farm operations. Operated by Beacon Energy.

Summary

Schedules maintenance and curtails turbines during bird migration at Beacon Energy sites.

License conditions

  1. May not exceed manufacturer load limits to increase output.
  2. Turbines curtail automatically when protected birds are detected nearby.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Renewal filed and approved with no change to scope.

  3. Renewal filed and approved after an independent evaluation.

  4. Renewal filed and approved after an independent evaluation.

  5. Renewal filed and approved with no change to scope.

  6. Renewal filed and approved with no change to scope.

  7. Renewal filed and approved.

  8. Renewal filed and approved with no change to scope.

  9. Renewal filed and approved.

  10. Renewal filed and approved.

  11. Renewal filed and approved with no change to scope.

  12. Renewal filed and approved.

  13. Retired and replaced by TR-06762.

Related filings

Also filed by Beacon Energy

All 8 filings by this operator →