Turing Registry · TR-02627

WINDWARD 9

Wind farm operations. Operated by Gannet Energy.

Summary

Controls blade pitch and yaw for 39 turbines at a wind farm near North Ironholm.

License conditions

  1. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Renewal filed and approved.

  5. Renewal filed and approved.

  6. Data-retention audit completed. Two minor findings, both resolved.

  7. Renewal filed and approved.

  8. Renewal filed and approved.

  9. Renewal filed and approved.

Also filed by Gannet Energy