Turing Registry · TR-02918

PIONEER GRID

Electrical grid balancing. Operated by Port Westcrest Electric.

Summary

Dispatches battery storage and demand response for Port Westcrest Electric, within limits set by the grid operator.

License conditions

  1. Hands control back to human operators within five seconds of any fault.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Annual resilience test completed. Manual fallback worked as required.

  3. Data-retention audit completed. Two minor findings, both resolved.

  4. Retired and replaced by TR-03374.

Related filings

Also filed by Port Westcrest Electric

All 17 filings by this operator →