Turing Registry · TR-03581

BALANCELINE

Electrical grid balancing. Operated by Riverlands Grid Operator.

Summary

Balances supply and demand across a distribution network serving about 517 thousand customers in East Ironhurst.

License conditions

  1. May not disconnect customers who depend on medical equipment.
  2. Hands control back to human operators within five seconds of any fault.
  3. Control actions above 52 MW require operator confirmation.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Complaint received from a member of the public. Investigated and closed with no breach found.

  3. Renewal filed and approved.

  4. Retired and replaced by TR-04921.

Related filings

Also filed by Riverlands Grid Operator

All 11 filings by this operator →