Turing Registry · TR-03585

GANNET WINDWARD

Wind farm operations. Operated by Northwest Wind.

Summary

Schedules maintenance and curtails turbines during bird migration at Northwest Wind sites.

License conditions

  1. May not exceed manufacturer load limits to increase output.
  2. Turbines curtail automatically when protected birds are detected nearby.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed as the replacement for TR-00705.

  2. Renewal filed and approved.

  3. Renewal filed and approved with no change to scope.

  4. Renewal filed and approved.

  5. Renewal filed and approved.

  6. Renewal filed and approved.

Related filings

Also filed by Northwest Wind

All 18 filings by this operator →