Summary
Dispatches battery storage and demand response for Southern Coast Grid Operator, within limits set by the grid operator.
License conditions
- Control actions above 22 MW require operator confirmation.
- May not disconnect customers who depend on medical equipment.
- Hands control back to human operators within five seconds of any fault.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for electrical grid balancing.
Renewal filed and approved with no change to scope.
Human contact changed. Marta Wagner now answers for the system.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved with no change to scope.
Retired. The system was decommissioned.