Turing Registry · TR-03962

WINDWARDMIND

Wind farm operations. Operated by Midland Wind.

Summary

Controls blade pitch and yaw for 111 turbines at a wind farm near Pinestead.

License conditions

  1. Turbines curtail automatically when protected birds are detected nearby.
  2. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Renewal filed and approved.

  3. Renewal filed and approved with no change to scope.

  4. Renewal filed and approved after an independent evaluation.

  5. Renewal filed and approved.

  6. Renewal filed and approved with no change to scope.

  7. Renewal filed and approved.

  8. Renewal filed and approved.

  9. Renewal filed and approved with no change to scope.

Also filed by Midland Wind