Turing Registry · TR-04125

YAWKEEPER

Wind farm operations. Operated by Heron Energy.

Summary

Controls blade pitch and yaw for 33 turbines at a wind farm near Irondale Harbour.

License conditions

  1. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Renewal filed and approved.

  3. Renewal filed and approved with no change to scope.

  4. Renewal filed and approved with no change to scope.

  5. Renewal filed and approved.

  6. Renewal filed and approved.

Also filed by Heron Energy

All 7 filings by this operator →