Summary
Dispatches battery storage and demand response for Inland Grid Operator, within limits set by the grid operator.
License conditions
- Control actions above 73 MW require operator confirmation.
- Hands control back to human operators within five seconds of any fault.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for electrical grid balancing.
Renewal filed and approved after an independent evaluation.
Renewal filed and approved with no change to scope.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved after an independent evaluation.
Renewal filed and approved with no change to scope.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved with no change to scope.
Renewal filed and approved.
Review opened after repeated alarms that operators had learned to ignore.