Turing Registry · TR-04821

BALANCE 8

Electrical grid balancing. Operated by Marhurst Public Utilities.

Summary

Dispatches battery storage and demand response for Marhurst Public Utilities, within limits set by the grid operator.

License conditions

  1. Control actions above 47 MW require operator confirmation.
  2. Hands control back to human operators within five seconds of any fault.
  3. May not disconnect customers who depend on medical equipment.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Human contact changed. Paloma Weatherall now answers for the system.

  3. Renewal filed and approved.

  4. Renewal filed and approved.

  5. Renewal filed and approved.

  6. Renewal filed and approved.

  7. Renewal filed and approved.

  8. Renewal filed and approved.

  9. Renewal filed and approved after an independent evaluation.

Also filed by Marhurst Public Utilities