Turing Registry · TR-05205

GYRE YAW

Wind farm operations. Operated by Inlet Energy.

Summary

Controls blade pitch and yaw for 93 turbines at a wind farm near Port Fernstead.

License conditions

  1. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Renewal filed and approved.

  5. Renewal filed and approved after an independent evaluation.

  6. Renewal filed and approved.

  7. Renewal filed and approved.

  8. Renewal filed and approved.

  9. Renewal filed and approved.

  10. Renewal filed and approved.

  11. Renewal filed and approved.

  12. Renewal filed and approved.

  13. Independent evaluation completed. License scope confirmed.

  14. Renewal filed and approved.

  15. Retired at the end of its service contract.

Also filed by Inlet Energy

All 9 filings by this operator →