Turing Registry · TR-05295

VANTAGE LOADLINE

Electrical grid balancing. Operated by North Southbridge Electric.

Summary

Balances supply and demand across a distribution network serving about 700 thousand customers in North Southbridge.

License conditions

  1. Hands control back to human operators within five seconds of any fault.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Renewal filed and approved with no change to scope.

  5. Renewal filed and approved.

  6. Annual resilience test completed. Manual fallback worked as required.

  7. Software update notified to the Registry. Scope unchanged.

  8. Renewal filed and approved after an independent evaluation.

  9. Renewal filed and approved.

Also filed by North Southbridge Electric