Summary
Controls blade pitch and yaw for 148 turbines at a wind farm near Heronport.
License conditions
- May not exceed manufacturer load limits to increase output.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for wind farm operations.
Data-retention audit completed. Two minor findings, both resolved.
Renewal filed and approved.
Renewal filed and approved with no change to scope.
Renewal filed and approved.
Retired at the end of its service contract.