Turing Registry · TR-05570

GRID 2

Electrical grid balancing. Operated by Redwick Falls Electric.

Summary

Dispatches battery storage and demand response for Redwick Falls Electric, within limits set by the grid operator.

License conditions

  1. Control actions above 10 MW require operator confirmation.
  2. Hands control back to human operators within five seconds of any fault.
  3. May not disconnect customers who depend on medical equipment.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Renewal filed and approved with no change to scope.

  5. Renewal filed and approved.

  6. Renewal filed and approved.

  7. Renewal filed and approved.

Also filed by Redwick Falls Electric

All 13 filings by this operator →