Turing Registry · TR-05713

VANTAGE CORRIDOR

Traffic signal optimization. Operated by Municipality of Hazelville Springs.

Summary

Adaptive signal timing for 175 intersections in Hazelville Springs, adjusting phase lengths to measured traffic every few seconds.

License conditions

  1. Emergency vehicle preemption takes precedence over all optimization.
  2. Minimum pedestrian crossing times are set by city engineers and may not be shortened.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed as the replacement for TR-00917.

  2. Renewal filed and approved.

  3. Operator reported a minor collision with a stationary object. Root cause fixed; no breach found.

  4. Renewal filed and approved.

  5. Renewal filed and approved.

  6. Renewal filed and approved.

  7. Renewal filed and approved.

  8. Renewal filed and approved.

  9. Renewal filed and approved.

  10. Renewal filed and approved.

  11. Renewal filed and approved after an independent evaluation.

  12. Renewal filed and approved.

  13. Data-retention audit completed. Two minor findings, both resolved.

  14. Renewal filed and approved.

Related filings

Also filed by Municipality of Hazelville Springs

All 23 filings by this operator →