Turing Registry · TR-06621

CISTERN 6

Water treatment control. Operated by Port Ashhurst Water and Sewer.

Summary

Doses treatment chemicals and manages filtration at 4 treatment plants serving Port Ashhurst.

License conditions

  1. The plant can be run manually at all times.
  2. Any water-quality alarm is reported to a human operator immediately.
  3. Chemical dosing stays within limits set by the public health regulator.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for water treatment control.

  2. Renewal filed and approved after an independent evaluation.

  3. Renewal filed and approved.

  4. Renewal filed and approved.

  5. Renewal filed and approved.

  6. Renewal filed and approved.

  7. Renewal filed and approved after an independent evaluation.

  8. Renewal filed and approved.

  9. Renewal filed and approved after an independent evaluation.

  10. Renewal filed and approved.

Also filed by Port Ashhurst Water and Sewer

All 11 filings by this operator →