Turing Registry · TR-06779

PHASE 5

Traffic signal optimization. Operated by Town of Goldstead.

Summary

Coordinates bus priority and pedestrian crossings along 16 arterial corridors in Goldstead.

License conditions

  1. Changes affecting more than ten intersections are reviewed by a human engineer.
  2. Emergency vehicle preemption takes precedence over all optimization.
  3. Minimum pedestrian crossing times are set by city engineers and may not be shortened.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for traffic signal optimization.

  2. Renewal filed and approved with no change to scope.

  3. Renewal filed and approved.

  4. Renewal filed and approved.

  5. Renewal filed and approved.

  6. Renewal filed and approved.

  7. Renewal filed and approved after an independent evaluation.

  8. Independent evaluation completed. License scope confirmed.

  9. Renewal filed and approved after an independent evaluation.

  10. Renewal filed and approved.

  11. Renewal filed and approved after an independent evaluation.

Also filed by Town of Goldstead