Turing Registry · TR-06973

GRID 4

Electrical grid balancing. Operated by Upper Valley Grid Operator.

Summary

Dispatches battery storage and demand response for Upper Valley Grid Operator, within limits set by the grid operator.

License conditions

  1. May not disconnect customers who depend on medical equipment.
  2. Control actions above 36 MW require operator confirmation.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved after an independent evaluation.

  3. Renewal filed and approved.

  4. Renewal filed and approved after an independent evaluation.

Also filed by Upper Valley Grid Operator