Turing Registry · TR-07905

GALE 8

Wind farm operations. Operated by Kowalski Power.

Summary

Schedules maintenance and curtails turbines during bird migration at Kowalski Power sites.

License conditions

  1. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Renewal filed and approved with no change to scope.

  3. Human contact changed. Teodor Navarro now answers for the system.

  4. Renewal filed and approved.

  5. Renewal filed and approved.

Also filed by Kowalski Power