Turing Registry · TR-07999

GRIDKEEPER

Electrical grid balancing. Operated by Riverlands Grid Operator.

Summary

Balances supply and demand across a distribution network serving about 704 thousand customers in Fernworth.

License conditions

  1. Control actions above 52 MW require operator confirmation.
  2. Hands control back to human operators within five seconds of any fault.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Renewal filed and approved.

Also filed by Riverlands Grid Operator

All 11 filings by this operator →