Turing Registry · TR-08048

TURBINE 8

Wind farm operations. Operated by Northwest Wind.

Summary

Schedules maintenance and curtails turbines during bird migration at Northwest Wind sites.

License conditions

  1. Turbines curtail automatically when protected birds are detected nearby.
  2. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Renewal filed and approved after an independent evaluation.

  5. Renewal filed and approved.

  6. Renewal filed and approved with no change to scope.

  7. Renewal filed and approved.

Also filed by Northwest Wind

All 18 filings by this operator →