Summary
Controls blade pitch and yaw for 104 turbines at a wind farm near North Highmont.
License conditions
- May not exceed manufacturer load limits to increase output.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for wind farm operations.
Renewal filed and approved.
Data-retention audit completed. Two minor findings, both resolved.
A control action briefly exceeded its limit during a storm. Reported within 72 hours; no breach found.