Turing Registry · TR-08837

BERTH 5

Container terminal operations. Operated by Sandleigh Port Authority.

Summary

Plans berth allocation and yard moves for Sandleigh Port Authority, coordinating 20 automated cranes.

License conditions

  1. Anyone entering an automated zone halts all equipment within it.
  2. Automated zones are physically separated from areas where people work.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed as the replacement for TR-05261.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

Related filings

Also filed by Sandleigh Port Authority

All 9 filings by this operator →