Turing Registry · TR-09454

SUMMIT YAW

Wind farm operations. Operated by Nettle Renewables.

Summary

Schedules maintenance and curtails turbines during bird migration at Nettle Renewables sites.

License conditions

  1. Turbines curtail automatically when protected birds are detected nearby.
  2. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed as the replacement for TR-05434.

  2. Renewal filed and approved.

  3. Renewal filed and approved after an independent evaluation.

  4. Renewal filed and approved after an independent evaluation.

  5. Independent evaluation completed. License scope confirmed.

Related filings

Also filed by Nettle Renewables

All 13 filings by this operator →