Summary
Dispatches battery storage and demand response for Pinewood Energy, within limits set by the grid operator.
License conditions
- May not disconnect customers who depend on medical equipment.
- Hands control back to human operators within five seconds of any fault.
- Control actions above 79 MW require operator confirmation.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for electrical grid balancing.
Human contact changed. Caleb Mercier now answers for the system.
Renewal filed and approved.