Summary
Balances supply and demand across a distribution network serving about 846 thousand customers in Sandleigh.
License conditions
- May not disconnect customers who depend on medical equipment.
- Hands control back to human operators within five seconds of any fault.
- Control actions above 32 MW require operator confirmation.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for electrical grid balancing.
A control action briefly exceeded its limit during a storm. Reported within 72 hours; no breach found.