Turing Registry · TR-10492

NACELLE 2

Wind farm operations. Operated by Heron Renewables.

Summary

Schedules maintenance and curtails turbines during bird migration at Heron Renewables sites.

License conditions

  1. May not exceed manufacturer load limits to increase output.
  2. Turbines curtail automatically when protected birds are detected nearby.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Complaint received from a member of the public. Investigated and closed with no breach found.

  3. Data-retention audit completed. Two minor findings, both resolved.

  4. Renewal filed and approved with no change to scope.

Also filed by Heron Renewables