Turing Registry · TR-11114

TURBINE 8

Wind farm operations. Operated by Aster Renewables.

Summary

Schedules maintenance and curtails turbines during bird migration at Aster Renewables sites.

License conditions

  1. Turbines curtail automatically when protected birds are detected nearby.
  2. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

Also filed by Aster Renewables