Turing Registry · TR-11264

KELP GRID

Electrical grid balancing. Operated by Port Rockford Public Utilities.

Summary

Dispatches battery storage and demand response for Port Rockford Public Utilities, within limits set by the grid operator.

License conditions

  1. Hands control back to human operators within five seconds of any fault.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

Also filed by Port Rockford Public Utilities