Turing Registry · TR-11311

KESTREL GRID

Electrical grid balancing. Operated by Bellhallow Electric.

Summary

Balances supply and demand across a distribution network serving about 292 thousand customers in Bellhallow.

License conditions

  1. Control actions above 34 MW require operator confirmation.
  2. May not disconnect customers who depend on medical equipment.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

Also filed by Bellhallow Electric

All 10 filings by this operator →