Summary
Balances supply and demand across a distribution network serving about 742 thousand customers in Riverwick.
License conditions
- Control actions above 80 MW require operator confirmation.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for electrical grid balancing.