Summary
Autonomous passenger ferries on 6 harbour crossings in North Bellton.
License conditions
- Sailings are cancelled automatically above the licensed wind and wave limits.
- A licensed master can take control remotely within 30 seconds.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for autonomous ferry service.