Turing Registry · TR-00014

MINERVA

Electrical grid balancing. Operated by Red River Power Cooperative.

Summary

Dispatches battery storage and demand response for Red River Power Cooperative, within limits set by the grid operator.

License conditions

  1. Control actions above 27 MW require operator confirmation.
  2. Hands control back to human operators within five seconds of any fault.
  3. May not disconnect customers who depend on medical equipment.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved with no change to scope.

  3. Annual resilience test completed. Manual fallback worked as required.

  4. Renewal filed and approved.

  5. Retired by the operator.

Also filed by Red River Power Cooperative

All 18 filings by this operator →