Skip to content
Turing Registry
Menu
Search
Browse
Domains
Operators
Revocations
Statistics
About
Frothly
Operator
Red River Power Cooperative
18 filings on the register, most recent first.
13
active
5
retired
Red River Power Cooperative: filings, most recent first
Filing
System
Domain
Latest filing
Status
TR-01908
LOADLINE PILOT
Electrical grid balancing
2026-08-12
Active
TR-04890
LOADLINEPATH
Electrical grid balancing
2026-07-13
Active
TR-01529
SUBSTATION WISE
Electrical grid balancing
2026-06-28
Active
TR-00856
FREQUENCY 7
Electrical grid balancing
2026-05-31
Active
TR-01189
SUMMIT FLOWMETER
Pipeline leak detection
2026-04-17
Active
TR-09532
PIPELINEFLOW
Pipeline leak detection
2026-03-05
Active
TR-05454
GRIDWORKS
Electrical grid balancing
2026-02-09
Active
TR-02641
ESTUARY FREQUENCY
Electrical grid balancing
2025-09-25
Active
TR-10398
WHIMBREL VOLTAGE
Electrical grid balancing
2025-06-08
Active
TR-01042
LOADLINEWISE
Electrical grid balancing
2025-04-03
Active
TR-09489
BALANCE 4
Replaced by TR-10398.
Electrical grid balancing
2025-03-05
Retired
TR-00854
LOADLINE 9
Electrical grid balancing
2025-02-22
Active
TR-05089
FREQUENCY KEEPER
Electrical grid balancing
2025-01-26
Active
TR-06600
VOLTAGE 7
Electrical grid balancing
2024-12-17
Active
TR-01872
SNIFFER 9
Replaced by TR-09532.
Pipeline leak detection
2023-03-08
Retired
TR-03556
DUNLIN FLOWMETER
Pipeline leak detection
2016-10-13
Retired
TR-02919
SNIFFERLINK
Pipeline leak detection
2016-01-08
Retired
TR-00014
MINERVA
Electrical grid balancing
2009-04-12
Retired