Turing Registry · TR-01784

FREQUENCY PATH

Electrical grid balancing. Operated by Northern Lakes Energy.

Summary

Dispatches battery storage and demand response for Northern Lakes Energy, within limits set by the grid operator.

License conditions

  1. May not disconnect customers who depend on medical equipment.
  2. Hands control back to human operators within five seconds of any fault.
  3. Control actions above 55 MW require operator confirmation.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Renewal filed and approved.

  5. Renewal filed and approved with no change to scope.

  6. Renewal filed and approved after an independent evaluation.

  7. Renewal filed and approved.

  8. Renewal filed and approved.

  9. Renewal filed and approved.

  10. Renewal filed and approved.

  11. Renewal filed and approved after an independent evaluation.

  12. Renewal filed and approved.

Also filed by Northern Lakes Energy

All 8 filings by this operator →