Turing Registry · TR-03807

VOLTAGE 8

Electrical grid balancing. Operated by Northern Lakes Energy.

Summary

Dispatches battery storage and demand response for Northern Lakes Energy, within limits set by the grid operator.

License conditions

  1. Control actions above 32 MW require operator confirmation.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed as the replacement for TR-00737.

  2. Renewal filed and approved after an independent evaluation.

  3. Renewal filed and approved with no change to scope.

  4. Renewal filed and approved.

  5. Renewal filed and approved.

  6. A control action briefly exceeded its limit during a storm. Reported within 72 hours; no breach found.

  7. Renewal filed and approved.

  8. Renewal filed and approved.

  9. Renewal filed and approved.

  10. Renewal filed and approved.

Related filings

Also filed by Northern Lakes Energy

All 8 filings by this operator →