Turing Registry · TR-02554

SUBSTATION 2

Electrical grid balancing. Operated by Pineleigh Bay Public Utilities.

Summary

Dispatches battery storage and demand response for Pineleigh Bay Public Utilities, within limits set by the grid operator.

License conditions

  1. May not disconnect customers who depend on medical equipment.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved after an independent evaluation.

  3. Renewal filed and approved with no change to scope.

  4. Renewal filed and approved.

  5. Renewal filed and approved with no change to scope.

  6. Annual audit completed with no findings.

  7. Renewal filed and approved.

  8. Renewal filed and approved.

  9. Renewal filed and approved after an independent evaluation.

  10. Renewal filed and approved.

  11. Renewal filed and approved.

  12. A control action briefly exceeded its limit during a storm. Reported within 72 hours; no breach found.

  13. Renewal filed and approved with no change to scope.

Also filed by Pineleigh Bay Public Utilities

All 13 filings by this operator →