Summary
Balances supply and demand across a distribution network serving about 285 thousand customers in Pineleigh Bay.
License conditions
- Control actions above 43 MW require operator confirmation.
- Hands control back to human operators within five seconds of any fault.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for electrical grid balancing.
Annual audit completed with no findings.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved.
Retired and replaced by TR-06148.