Turing Registry · TR-03031

FATHOM BALANCE

Electrical grid balancing. Operated by Granite Coast Grid Operator.

Summary

Dispatches battery storage and demand response for Granite Coast Grid Operator, within limits set by the grid operator.

License conditions

  1. Control actions above 30 MW require operator confirmation.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed as the replacement for TR-00887.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Renewal filed and approved.

  5. Renewal filed and approved with no change to scope.

  6. Renewal filed and approved.

  7. Renewal filed and approved after an independent evaluation.

  8. Renewal filed and approved.

  9. Renewal filed and approved.

  10. Renewal filed and approved with no change to scope.

  11. Sensor outage of 13 hours. The plant ran under manual control throughout.

Related filings

Also filed by Granite Coast Grid Operator

All 17 filings by this operator →