Turing Registry · TR-03059

NACELLEMIND

Wind farm operations. Operated by Janssen Power.

Summary

Schedules maintenance and curtails turbines during bird migration at Janssen Power sites.

License conditions

  1. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Renewal filed and approved.

  3. Retired and replaced by TR-04349.

Related filings

Also filed by Janssen Power

All 9 filings by this operator →